1. Finish Polishing the exhaust. - Clean Head
2. Check P2V clearance - Clean Head
3. Decide on Gasket Thickness 0.027" or 0.045" (Will use 0.027" if P2V allows)
4. Lapp Valves - Clean Head
5. Install 26lb springs
6. Drain Oil
7. Open and Clean Crank Case
8. Inspect, Clean, Lubricate crank, cam, lifters....
9. Replace Side Cover Gasket with new one, Attach Side Cover, Fill with Oil.
10. Remove Flywheel, Check Flywheel key, Re-Attach Flywheel
11. Set Coil Gap to .030"
12. Seal Head with Head Gasket
13. Attach Carb Adapter with Gaskets
14. Attach studs to Carb Adapter
15. Attach Carb to carb adapter with new gasket
16. Attach Air Filter to Carb
17. Fan Shroud/ Recoil Starter
18. Gas tank
19. Exhaust Pipe- new gasket
20. Throttle Plate
21. Throttle Linkage
21. Set Valve Lash
22. Valve Cover - New Gasket
23. Torque Converter
24. Chain
25. Brakes
26. Jet the Carb
27. Do Wheelies
28. Remove Engine
29. Add Two Engines
30. Do Bigger Wheelies!
31. Check for Valve Seal
32. cc combustion chamber
I will keep the 10.8 lb springs in for the next few tests.
31. Check Valve Seal
32. CC the combustion chamber (see if polishing made a significant difference)
2. Check Piston to Valve Clearance
After that, I can open the crankcase, drain the oil, clean everything, and reassemble. Should be like 3 months and 20 pages.