Got the brake lever in with spacer and everything. Cut my cable casing to length, brakes are basically done other than hooking the cable and springs to the trans when I get it back in.
Built carb
Got engine running on a bottle
Installed catch can system
Started installing transmission
Found some worn out dog chain to make a tire chain for my drive wheel
Reverse chain was removed and trans was repacked with grease. All I need to do now is figure out the tensioner and fuel tank mounting, then it can be taken out for its first drive.