So, it's been a while since I've updated this thread. The kart sat for quite a while pissing me off, until I finally got the water pump rebuilt.
I also re-did the shifter linkage, moving the handle up to the beltline of the frame, using a Morse cable from a Honda Civic shifter to connect to the engine.
I decided to start working on it again this week, beginning with a trip to the local junkyard. They got in a bunch of three wheelers recently, so I grabbed a pair of nice 22x11-8 knobby tires and wheels for the rear. These should serve to correct my overly low gear ratio as well as providing more traction. I need to source some new taller front runners also, the current short trailer tires don't look right with the rear balloon tires.
I also decided that I was done screwing around with bellcrank steering designs, and it was time for a proper rack and pinion. Can't afford $100 for a buggy unit right now though. I pulled the rack from a Hyundai Excel at the junkyard ($16 out the door), and narrowed it today. It's not the exact correct length in relation to my front suspension, but I feel that it won't really matter due to the short travel of the suspension setup.
Disassembled:
Chopped to size. The length from the end was welded to the stub remaining on the rack body, this allowed the stock plastic bushing to be reused, as well as allow for the boot to be mounted.
Shaft cut to length and beveled for welding:
Welded and ground smooth.
More pics tomorrow.