subydrift
Member
I got some more work done on the motor this last week. I got the output shaft replaced and the gear box all rebuilt and resealed. I also got the new clutch, variator with 9 gram rollers, and cvt belt installed and got everything all cleaned up and reasssembled. Now on to the top end rebuild!
I also got the wheels powder coated and the tires mounted so she'll be rolling tonight! I'll post another update tomorrow with it on the ground finally.
Here's some update pics, you can see the old output shaft was twisted and cracked.





I also got the wheels powder coated and the tires mounted so she'll be rolling tonight! I'll post another update tomorrow with it on the ground finally.
Here's some update pics, you can see the old output shaft was twisted and cracked.
















