kartingizm
Murray Hardrive Gokart
- Messages
- 173
- Reaction score
- 0
ok i got a engine mount with the jackshaft inside of the mount from bmikarts. so i slotted the holes for the engine to slide so i can adjust the chain tension where the clutch and first jackshaft sprocket are. so thats taken care of but im wondering before i weld the engine mount to the swingarm, should i attach the chain and connect the 2nd jackshaft sprocket with the axle sprocket and adjust the chain tension and then while the chain is at good tension weld it to the swingarm? do you think there is any better way? thanks
btw i accidentally made this thread in project logs.
btw i accidentally made this thread in project logs.