A bit of progress for today. I began by cutting two 2 1/4" lengths of 1 1/2" Sch40 gas pipe, and welding one to each side of the frame behind the wheel. Using the ring-mount tongue jack, I can service the bearings or change the tire at the side o' the road without digging through my vehicle for the crappy factory scissor jack...
I also dug into the loading ramp. It WAS just a big ramp that dropped down. Not anymore!!!
I began by whipping out the trusty grinder, and cutting the entire ramp in half lengthwise. Now, it's 2 ramps- left and right. I used a length of 1"x1/8" angle along the open side of each ramp. I did some experimenting towards the desired end result- ramps that could either swing down, or out- barn door style- depending on which hinge pins you pull out...
(Getting awfully close to calling it RoboTrailer...)