Already been done and lots of work fixing everything, still need to do water lines but I'm gonna put a much bigger tank in it and install a shower, you can put a hand in each sink at same time, no need for two sinks that close so I'll put shower where bathroom sink is or make it a wet room. Garage almost clean and will move 6x6 back in to finish what i can before I have to reload it and head north. I'll get some pics sooner or later and hopefully a video or two of it running.